Delaware Department of
Health & Social Services
1988-1994 Project Experience


Project Title
Herrmann M. Holloway Main Campus
  • 1989 - Kent/Sussex Building HVAC Unit Replacement
  • 1989 - Kent/Sussex Building Water Piping Replacement
  • 1989 - Kent/Sussex Gawthrop and CottageSewage Lift Station
  • 1991 - Main Building Chimney Study
  • 1991 - Main Building Chimney Design
  • 1991 - Mechanical Modifications to Steam & Condensate Piping Systems
  • 1991 - Main Building & Annex, Steam Condensate Piping Replacement
  • 1992 - Main Building & Annex, Steam Condensate Piping Replacement and Control Modification Design
  • 1992 - Kent/Sussex Building Fire Alarm Study
  • 1992 - Main Building and Annex Elevator & Passageway
  • 1992 - Main Building Elevator Modernization Study
  • 1993 - Main Building Elevator Moderization Design
  • 1997 - Installation of Central Air Conditioning
  • 1994 - Additional Steam & Condensate Piping and Control Modifications
Emily P. Bissell Hospital
  • 1991 - Oxygen Piping Installation
  • 1992 - Elevator Modifications Study
  • 1993 - Elevator Modifications Design
  • 1993 - Laundry Elevator Modifications
  • 1993 - TB Ward Mechanical Modifications
  • 1993 - Electrical Panel Replacement and Emergency Generator
  • 1993 - Nurse Call System Upgrade
Delaware Hospital for the Chronically Ill
  • 1993 - Pricket Building Elevator Recall
  • 1991 - Boiler Plant, New Central Boilers
  • 1991 - Boiler Plant, New Fire Alarm Panel
  • 1993 - Candee Building, Fire Alarm System, Design and Study
  • 1993 - Underground High Pressure Steam and Condensate Piping Between Laundry & Candee Building
  • 1993 - Steam Trap Replacement in Tunnels and Control Modifications to Medical Center
Governor Bacon Health Center
  • 1988 - Hughes School HVAC and Kitchen (GHM)
  • 1990 - Tilton Building Dayroom
  • 1993 - Tilton Building Elevator Replacement



800 Woodlawn Ave.
Wilmingtn, DE 19805
P: 302.656.8381
F: 302.656.0800
E-mail us at: MahaffyEng@aol.com

© 1998 Mahaffy & Associates, Inc. All rights reserved.